John Smith
10 February 2026
Conducted an annual lightning protection test and found issues with down conductors that required temporary fixes.
John to keep an eye on the air terminals over the next week.
Found loose bonding clamp and surface corrosion.
Cleaned and tightened clamp; put in a temporary fix for now.
Replace corroded bonding clamps, repaint and test air termination points
| Item | Quantity | Priority |
|---|---|---|
| Replacement of corroded bonding clamps | 1 | Medium |
| Repaint and testing of air termination points | 1 | Medium |
Call-out and labour performed plus bonding clamp used
| Item | Quantity |
|---|---|
| Call-out fee plus 1 hour of labour | 1 |
| Bonding clamp used on down conductor | 1 |