Alex Johnson
10 February 2026
Conducted quarterly inspection of play area and found issues with swing frame and surfacing.
Alex to keep an eye on the play equipment condition over the next week.
Found loose bolts on swing frame; tightened bolts.
Bark levels low; raked surface as temporary fix.
For new swing shackles and bolts, top up bark/impact mulch
| Item | Quantity | Priority |
|---|---|---|
| New swing shackles and bolts | 1 | Medium |
| Top up bark/impact mulch | 1 | Medium |
Call-out plus 1 hour labour and materials used.
| Item | Quantity |
|---|---|
| Call-out and one hour of labour | 1 |
| Nylock nuts used on swing bolt | 1 |